Quality & Certification

Every component leaving our facility is backed by a certified quality management system, in-process inspection, and independent dimensional verification.

ISO 9001:2015 Certified

Our quality management system has been independently assessed and certified by QRO — Quality Research Organization, a IAF accredited body — confirming our compliance with the internationally recognised ISO 9001:2015 standard.

Standard ISO 9001:2015 Quality Management System
Certificate No. 305026051456Q
Issued By QRO — Quality Research Organization
Date Issued 14th May 2026
Valid Until 13th May 2029
Scope Manufacturing and Precision Machining of Metal Castings, Dies, Jigs & Fixtures, and Graphite Components
Facility Plot D 21/22, MIDC Satpur, Nashik – 422007, Maharashtra, India
ISO 9001:2015 Certificate

Our Quality Management System

Our Quality Management System is built on the principles of ISO 9001:2015, ensuring that every component we deliver meets the highest standards of precision, consistency and reliability.

Process Control

Every machining operation is carried out following defined process parameters, ensuring repeatability and dimensional accuracy across all production runs — from single prototypes to repeat orders.

In-Process Inspection

Our skilled workforce conducts in-process inspections at each stage of machining to identify and correct deviations before they propagate — reducing rework and ensuring first-time accuracy.

Internal Quality Audits

Regular internal audits are conducted to ensure compliance with our QMS procedures and to drive continuous improvement across all operations and machining processes.

First-Article Inspection

For new components, a full first-article inspection is carried out against the client's drawing before series production begins — ensuring every dimension is validated before commitment.

Document Control

All work orders, inspection records, and delivery notes are documented and retained in accordance with ISO 9001:2015 requirements — providing full traceability for every job.

Supplier Evaluation

Raw material suppliers are evaluated and approved in line with our QMS procedures — ensuring the material entering our facility meets the grade and quality required by the job.

Multi-Stage Quality Verification

We follow a rigorous multi-stage inspection process to ensure every component leaving our facility meets the required dimensional accuracy and surface quality specifications.

1

Raw Material Received

2

First Article Inspection

3

In-Process Checks

4

Final Internal Inspection

5

CMM External Verification

6

Dispatch & Delivery

Internal Inspection

  • Dimensional verification using precision gauges and measuring instruments
  • In-process checks at each machining stage
  • Visual inspection for surface finish and defects
  • First-article inspection for new components
  • Final inspection before dispatch

Independent Inspection

  • External CMM (Coordinate Measuring Machine) inspection for critical components
  • Third-party dimensional certification available on request
  • Traceable measurement reports provided to clients
  • Ensures unbiased verification of complex geometries and tight tolerances

Measuring Instruments & Tools

Accurate measurement is as important as accurate machining. Our facility is equipped with precision gauging instruments to verify dimensions at every stage of production.

In-House Instruments

  • Vernier callipers and digital callipers
  • Micrometer sets (outside, inside, depth)
  • Dial test indicators and dial gauges
  • Height gauges and surface plates
  • Bore gauges and plug gauges
  • Thread gauges and ring gauges

External CMM Verification

  • External CMM inspection arranged for critical or high-tolerance components
  • Measurement reports with traceable calibration references
  • Ballooned drawing inspection against all critical dimensions
  • Available as a standard service or on client request

Quality you can rely on.

Our certification and inspection process gives you the confidence that every component meets your drawing requirements — first time, every time.

Talk to Our Team